WikiRank.Live

Version L1.32

Bauzeitenplan

Language:de

Bauzeitenplan

in German Wikipedia


Length (bytes): 1365 (2.13%)
Number of references: 0 (0%)
Number of images (at least 5000 px2): 0 (0%)
Headers (1st & 2nd level): 1 (4.76%)
References / Length: 0 (0%)

Quality Flaws:

-0.07 points

Problems: More citations needed

Description

Overall quality score: 1.31 out of 100 for the article “Bauzeitenplan” on German Wikipedia. Its very poor overall result indicates that the measured features are still far from the Featured Article benchmarks. The considered article was last modified on 14 September 2023 at 09:33:35 UTC.

The text is relatively brief compared with the Featured Article benchmark, resulting in a very poor length rating. There are relatively few major section headings, giving this measure a very poor rating. No images large enough to qualify for the image measure were found, resulting in a very poor image score.

No inline citation markers were detected. Both the reference-count score and the references-to-length score are therefore very poor, indicating that sourcing needs attention.

The considered version of the Wikipedia article also contains a quality-flaw template, identified in English as “More citations needed”. This editorial notice flags an issue that needs attention. The detected flaws reduce the overall quality score by 0.07 points.

Characteristics:

Presented points are based on comparison of characteristics of the article with a median of each relevant characteristics of the Featured Articles in German Wikipedia. The table below shows those medians:

Characteristics Median*
Length (bytes) 64190
Number of references 73
Number of images (at least 5000 px2) 15
Headers (1st & 2nd level) 21
References / Length 0.0011409
* - Extraction and analysis the characteristics of Featured Articles in German Wikipedia was performed in July 2026

CC BY-SA 3.0